Structural Engineering Drawings Stamped Before Permit
Every second story addition in Massachusetts requires stamped engineering drawings from a licensed Massachusetts Professional Engineer specifying foundation capacity verification, beam material and dimensions, floor framing system, roof framing system, and load path calculations from new floor through existing structure to foundation. Town permit offices require the stamped drawings before permit approval. Skipping the engineer is illegal and uninsurable on any project of this scope.
