Waterproofing Membrane System Before Any Tile
The single most important phase of any bathroom remodel is the waterproofing membrane in wet zones. Industry-standard systems (Schluter Kerdi, RedGard, Mapei Mapelastic, or equivalent) installed and inspected before any tile work begins. Skipping the membrane or installing it incorrectly produces failures at 18 to 36 months as substrate rots, mold spreads, and tile detaches. Waterproofing is a separate trade phase, not a tile-installer afterthought.




